PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed motorized damper controllers at the 1st floor Facing North.jpg Installing bathrom carriers at the 4th floor Facing East.jpg Installing curtain wall returns at the South Elevation 1.jpg Installing curtain wall returns at the South Elevation 2.jpg Installing motorized damper controllers at the 2nd floor Facing South.jpg Installing sprinkler main raiser at Stair -2 4th Floor Facing East.jpg Laying out block at the 1st floor Sally ports Facing West.jpg Sprinkler main raiser at Stair -2 Facing East.jpg Started installing panel boards at the electrical room Facing East.jpg
Previous pageNext page Installing motorized damper controllers at the 2nd floor Facing South
Installing motorized damper controllers at the 2nd floor Facing South